Aug. 2nd, 2011

chickenfeet: (bike)
I was out exploring a couple of new bike routes in the east end of the city this morning. Things started off OK. I took the Waterfront Trail to the point where one can turn north onto the UoT Scarborough campus and followed the loop of trails swinging north and back west to end up on Lawrence Avenue. From their a linking route on side streets got me to what looked on the map like a hydro easement trail heading southwest. It was but it was still under construction in places which was rather irritating and made for some tedious detours. Then I got a flat and had to spend about 45 minutes changing a tyre tube. Then I discovered that the next stage of my route was impassable owing to bridge repairs. By this time it was very hot and I was fairly fed up. I could see from the map that I wasn't too far from Kennedy station so I headed there, took the subway to Sherbourne and then coasted home down the Sherbourne bike lane.I guess had I finished my planned route it would have been close to 70km. As it was I did about 45km.

June 2025

S M T W T F S
1 23 4 5 6 7
8 91011 12 13 14
15 16 17 18 19 20 21
22 23 2425 26 2728
2930     

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jun. 29th, 2025 01:13 pm
Powered by Dreamwidth Studios