Dec. 13th, 2014

chickenfeet: (Default)
Things are moving. This week we bought a bathtub and shower valves and taps for the bathroom. All of the basic engineering details are now worked out. The supports are in for the dropped ceilings. The increased height in the kitchen and the space between living room, bedroom and bathroom is pretty amazing.

These photos show the hallway and the living room with the ceiling supports in. The yellow tape marks where the pot lights will go.

ceiling

hall

Next up, selecting tiles and a vanity for the bathroom and detailed design of the kitchen.

January 2026

S M T W T F S
     1 2 3
4 5678910
11121314151617
18192021222324
25262728293031

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 6th, 2026 11:21 pm
Powered by Dreamwidth Studios