Reno update
Dec. 13th, 2014 08:48 amThings are moving. This week we bought a bathtub and shower valves and taps for the bathroom. All of the basic engineering details are now worked out. The supports are in for the dropped ceilings. The increased height in the kitchen and the space between living room, bedroom and bathroom is pretty amazing.
These photos show the hallway and the living room with the ceiling supports in. The yellow tape marks where the pot lights will go.


Next up, selecting tiles and a vanity for the bathroom and detailed design of the kitchen.
These photos show the hallway and the living room with the ceiling supports in. The yellow tape marks where the pot lights will go.


Next up, selecting tiles and a vanity for the bathroom and detailed design of the kitchen.